Roads & Closures1 min read

Box lorry wedged under 4.3m railway bridge in Bromley Cross, Bolton

A box lorry hit the railway bridge at Turton Road / Darwen Road on 23 November, stopping trains until Network Rail had inspected it.

Box lorry stuck under a low railway bridge

A box lorry got wedged under the 4.3m (14'0") railway bridge at Turton Road / Darwen Road in Bromley Cross, Bolton, on the afternoon of Sunday 23 November, according to our UKcheckpoints page.

Trains were stopped until Network Rail had inspected the bridge, then resumed. Traffic on the road backed up until the lorry was recovered and removed. The council put up signs in the last year warning which vehicles the bridge isn't suitable for.

The wider picture

Network Rail's figures show 1,706 railway bridge strikes across Britain in 2025/26, about one every five hours. They cost around £13m in delays, cancellations and repairs, and Network Rail claims those costs back from hauliers. Traffic commissioners have warned that operators can lose their O-licence over bridge strikes.

  • Know your full running height, load included, and keep it displayed in the cab
  • Plan your route around low bridges before you set off
  • Obey the height signs. If you don't fit, don't try it

Source: UKcheckpoints

Share this story