Train movement derailed at Stafford checkpoint
Last week, a DVSA Enforcement Team at Stafford checkpoint (Doxey) were alerted to this abnormal load. Abnormal because: – it was the wrong special type (STGO) category for the weight – it should have been category 3 – the movement order became incorrect due to the wrong…

Last week, a DVSA Enforcement Team at Stafford checkpoint (Doxey) were alerted to this abnormal load.
Abnormal because:
– it was the wrong special type (STGO) category for the weight – it should have been category 3 – the movement order became incorrect due to the wrong category – it was 100% overweight at 88 tonnes – it was insecure as packing and straps not securely stored in an appropriate location – it had 3 tyres that were damaged or below the legal tread limit
The operator now has to get another movement order which will take around 5 days – after replacing the damaged tyres.
If you’re transporting an unusual load, to avoid lengthy delays make sure it’s being done correctly, check out the official special types enforcement guide here


